Several entry and exit ramps at the New Kelani Bridge will be temporarily closed from today (November 23) until December 1 due to construction work linking the bridge with the Port Access Elevated Highway.
According to the Road Development Authority (RDA), the closures will affect the Ingurukade Interchange at different times during the period.
Both entry and exit ramps will be closed from 9.00 p.m. today until 5.00 a.m. on November 25.
From November 25 to 27, only the exit ramp will be closed from 9.00 p.m. to 5.00 a.m. the following day.
Both ramps will again be closed from 9.00 p.m. on November 28 until 5.00 a.m. on December 1.
The RDA said the closures will affect vehicles travelling from Katunayake and Orugodawatta towards the Colombo Port and Ingurukade Junction, as well as vehicles travelling in the opposite direction towards Katunayake and Borella.
Motorists travelling from Katunayake or Kandy towards the Colombo Port and Ingurukade Junction have been advised to use the Peliyagoda or Orugodawatta exits.
Vehicles travelling from Orugodawatta towards the Colombo Port should use the ground-level road at the New Kelani Bridge.
Meanwhile, motorists travelling from the Colombo Port or Ingurukade Junction towards Katunayake have been advised to use the ground-level road at the New Kelani Bridge and enter the expressway through the Peliyagoda entrance.
Those travelling towards Borella from the Colombo Port or Ingurukade Junction should also use the ground-level road at the New Kelani Bridge.
Motorists have been urged to follow the alternative routes and plan their journeys accordingly during the construction period.